Leave a Message
By providing your contact information to Bea Wolfe, your personal information will be processed in accordance with Bea Wolfe's Privacy Policy. By checking the box(es) below, you expressly consent to receive marketing or promotional real estate communication from Bea Wolfe in the manner selected by you. For SMS text messages, message frequency varies. Message and data rates may apply. Consent is not a condition of purchase of any goods or services. You may opt out of receiving further communications from Bea Wolfe at any time. To opt out of receiving SMS text messages, reply STOP to unsubscribe. SMS text messaging is subject to our Terms of Use.
Thank you for your message. We will be in touch with you shortly.
Explore Our Properties
Sunlit condominium living room with oak floors, comfortable seating and tall windows overlooking a small suburban downtown in late autumn.

Who Clarendon Hills' New Downtown Condos Are Built For

November 26, 2026

"There is not enough housing inventory currently available in Clarendon Hills to meet the growing demand." That line comes from the Village Board minutes of September 15, 2025. It was said on the night trustees voted 5 to 1 to approve a four-story condominium building at 104 Walker Avenue, at the corner of Park and Walker downtown.

The shortage is real. What matters for anyone shopping for a condo or townhome in Clarendon Hills is which shortage this building answers. The pricing the developer described, set beside October 2026 figures for DuPage County, shows that the newest attached housing downtown is aimed at people who already own a house in the village and want to stay. It does not add starter homes. A downsizer and a first-time buyer reading the same headline should come away with very different plans.

The price of 104 Walker

The project is called Parkside Place. Its June 2025 application described a joint venture between Redwood Construction Group and Crossmanage. The plan then was 15 for-sale condos, 12 boutique lodging units and ground-floor retail and co-working space. That application also listed elevator access, indoor parking, a rooftop terrace and a public plaza among the planned features. Patch covered the proposal when it surfaced in June 2025.

The lodging units did not survive review. Before the vote, the Zoning Board of Appeals recommended approval on the condition that any upper-floor hotel or lodging use be replaced with residential units. The version trustees approved was described as 17 condominiums with a small first-floor retail space.

The land has a history with the Village. Trustee Chaudhry said at that meeting that 104 Walker had sat vacant for years and that earlier owners had struggled to reach a deal with developers. The Village then bought the property so it could combine it with 301 Park Avenue and find a developer for the two sites together.

At the August 7, 2025 public hearing, the developer said one-bedroom condos would run around the high $600,000s and three-bedroom units would start at $1.5 million, "depending on the market price," and called them custom units. Those figures were early estimates, given while the plan still included lodging. Treat them as a sense of where the project is aimed, not as a price list.

Set beside the county

The Illinois REALTORS October 2026 report for DuPage County puts the median condo sale price for that month at $290,000. The median single-family price for the same month was $530,339, and the median across all properties was $440,000.

Put the Parkside estimates next to those numbers. A one-bedroom in the high $600,000s comes to more than twice the October 2026 county condo median. It also tops the median price of a detached DuPage house that month. A three-bedroom starting at $1.5 million is more than five times the county condo median.

At those prices, the buyer is not someone moving up from renting. It is someone with substantial equity in a house, likely a house nearby, who wants one-level living with an elevator and indoor parking without leaving the village. For that buyer, Clarendon Hills has had few places to go, and 104 Walker is the Village's answer to that shortage.

The rest of the county is loosening

The Village's view of local scarcity sits against a county market that gained listings over the past year. In October 2026, DuPage had 1,564 homes for sale, up 17.4% from 1,332 in October 2025. Median days on market rose from 19 to 21 over the same period, and October closings fell 5.5%, to 823. The all-property median price still rose 6.4% year over year, to $440,000. The statewide Illinois REALTORS release for October 1 through October 31, 2026, described the same mix of higher prices and inventory with fewer sales.

Of the 823 DuPage closings in October 2026, 305 were condos. Condos are a real share of the county market, mostly at price points well below what is being planned for downtown Clarendon Hills. These are county figures, and village-level numbers can differ a great deal. Still, they show a split. Across DuPage, a buyer in October 2026 had more to choose from and a little more time to decide. Inside a small, walkable village with few attached homes, the newest options are coming in at the top of the market.

Townhomes on Park Avenue

Parkside Place is not the only attached housing moving through Village Hall. The Village's 2026 building permit report, printed November 4, 2026, lists permit 2026-0013, issued February 9, 2026, for "421 Park Units ABC / 423 Park A6 New Townhomes." The contractor named is Tranquility Builders, and the listed construction value is $3,000,000.

A permit records construction value, not sale price, so it says nothing directly about what these townhomes will list for. It does confirm that new attached homes are planned on Park Avenue. For a downsizer who wants stairs and a little more privacy rather than an elevator building, this project belongs on the list.

What a downsizer selling in the village should weigh

For a longtime owner thinking about a move to a downtown condo, timing is the main question. The latest public status of Parkside Place comes from the Village Board minutes of October 19, 2026. The community development director reported that a pre-construction meeting was set for 104 Walker to cover safety and fencing. In the same discussion, the village president asked that weekly coordination meetings, of the kind used on another recent downtown project, be applied to 104 Walker and the upcoming Streetscape project. The June 2025 application projected a final certificate of occupancy in mid-2027. That was a projection submitted before the redesign.

So a downsizer is lining up two transactions, the house they sell and the condo they buy, and one of them has no move-in date yet. The county data says something about the selling side. In October 2026, DuPage inventory was up and days on market were slightly longer than a year earlier, while prices kept rising. A seller who expects the fastest market of recent years may be surprised. A seller who prepares and prices carefully is still selling into rising values. Deciding when to list, and where to live in between if the new unit is not ready, is the practical planning this move needs, and it is the part of a downsizing plan that most deserves a calendar.

What a first-time buyer should take from this

For a first-time buyer, the new projects mostly point elsewhere. Neither Parkside Place nor the Park Avenue townhomes appears aimed near the October 2026 DuPage condo median of $290,000. A buyer who wants Clarendon Hills and its Metra station on the BNSF line will be looking at resale condos and townhomes, which come up one at a time. It also makes sense to compare nearby communities such as Westmont, Willowbrook and Darien on the same terms.

Earlier plans still in the record

Several other attached-housing proposals have come before the Village in recent years, and buyers may hear about them. In July 2024, Patch reported that Alps Investment Group had proposed six row homes on the site of the former village firehouse at 214 Burlington Avenue. The Village Board was then considering a $60,000 sale with a proposed five-year window to complete the project. In June 2025, Patch also reported on The Oaks of Clarendon Hills at 5740 Concord Avenue. WK Builders sought a final subdivision plat there, near an existing condo building, with a proposal for vacant land to the west near 58th Street.

Go back further and the Village's March 2006 downtown plan named Park Avenue Station as a then-recent condominium development downtown. That plan also listed a proposed 24-unit multistory condo building at Burlington and McIntosh. Downtown condos have been part of the Village's planning for two decades. They have arrived one building at a time.

FAQ

How many condos will Parkside Place have? The concept the Village Board approved on September 15, 2025, was described as 17 condominiums with a small first-floor retail space. The upper-floor lodging units in the original proposal were dropped.

What will the units cost? At the August 7, 2025 hearing, the developer estimated one-bedrooms around the high $600,000s and three-bedrooms from $1.5 million, depending on the market. Those estimates came before the redesign.

Where can I compare Clarendon Hills with nearby towns? Start with the Clarendon Hills neighborhood page, then the Hinsdale and Westmont pages next door.

If you own a home in Clarendon Hills and a downtown condo is starting to sound like the right next step, the hardest part is often the order of things: when to list, what your house is worth in this market and where to land if the new unit is not ready yet. Bea Wolfe is a Seniors Real Estate Specialist who builds that plan with you, at your pace, and you can start with a home valuation or a conversation through Bea Wolfe. Let's Connect.

Follow Me On Instagram